Comparent
RestrictedCity

Short-Term Rental Regulations
in Stonington, CT

Last verified: March 2026 · Report an update

Zoning & Conditions

Short-term rentals (STRs) are allowed only if registered and permitted by the Town; permits are limited to primary residences (requirement phased in January 2024). Maximum occupancy is capped at two persons per bedroom (excluding children under 12), events are prohibited, and a designated local owner or agent must be available to respond to complaints within 30-60 minutes. Owners must post emergency and trash information and include the Town-issued registration number in all listings.

How to Obtain a Permit

1) Submit an annual registration via the Town's specified platform including proof of primary residency (e.g., driver's license, tax documents), owner/agent contact info, a sworn statement regarding smoke/CO detectors, and listing URLs. 2) Pay the annual permit fee established by the Board of Selectmen. 3) Upon approval, receive a registration number that must be displayed in all listings; renewals are required annually.

Official Resources

Official Stonington STR regulation source

Frequently Asked Questions

Are short-term rentals allowed in Stonington, CT?
Short-term rentals (STRs) are allowed only if registered and permitted by the Town; permits are limited to primary residences (requirement phased in January 2024). Maximum occupancy is capped at two persons per bedroom (excluding children under 12), events are prohibited, and a designated local owner or agent must be available to respond to complaints within 30-60 minutes. Owners must post emergency and trash information and include the Town-issued registration number in all listings.
Is a permit required to operate a short-term rental in Stonington?
Yes, a permit is required to operate a short-term rental in Stonington. 1) Submit an annual registration via the Town's specified platform including proof of primary residency (e.g., driver's license, tax documents), owner/agent contact info, a sworn statement regarding smoke/CO detectors, and listing URLs. 2) Pay the annual permit fee established by the Board of Selectmen. 3) Upon approval, receive a registration number that must be displayed in all listings; renewals are required annually.
How do I get a short-term rental permit in Stonington?
1) Submit an annual registration via the Town's specified platform including proof of primary residency (e.g., driver's license, tax documents), owner/agent contact info, a sworn statement regarding smoke/CO detectors, and listing URLs. 2) Pay the annual permit fee established by the Board of Selectmen. 3) Upon approval, receive a registration number that must be displayed in all listings; renewals are required annually.
Comparent

Looking for property managers in Stonington, CT?

Compare top-rated short-term rental managers on Comparent — read reviews, see pricing, and find the right fit.

View Property Managers

Disclaimer

This information is for general reference only and may not reflect the most current regulations. STR regulations change frequently. Always verify requirements with official local government sources before operating a short-term rental.

Last verified: March 2026 · Suggest a correction