Comparent
RestrictedCounty

Short-Term Rental Regulations
in Leelanau County, MI

Last verified: March 2026 · Report an update

Zoning & Conditions

STRs are regulated at the township level with specific caps (e.g., 150 in Suttons Bay, 93 in Elmwood) and occupancy limits (typically 3 per bedroom, max 15). Requirements include a local 24-hour contact within 45 minutes, neighbor notification, and mandatory septic pumping every three years for non-sewered properties.

How to Obtain a Permit

1. Submit a completed Short-Term Rental Permit Application to the respective Township Zoning Office with the required fee (e.g., $200-$600). 2. Provide required documentation including a signed neighbor notification affidavit and proof of septic tank pumping within the last 3 years. 3. Renew the permit annually (renewal windows vary, e.g., Oct 1 - Feb 28 in Suttons Bay).

Official Resources

Official Leelanau County STR regulation source

Frequently Asked Questions

Are short-term rentals allowed in Leelanau County, MI?
STRs are regulated at the township level with specific caps (e.g., 150 in Suttons Bay, 93 in Elmwood) and occupancy limits (typically 3 per bedroom, max 15). Requirements include a local 24-hour contact within 45 minutes, neighbor notification, and mandatory septic pumping every three years for non-sewered properties.
Is a permit required to operate a short-term rental in Leelanau County?
Yes, a permit is required to operate a short-term rental in Leelanau County. 1. Submit a completed Short-Term Rental Permit Application to the respective Township Zoning Office with the required fee (e.g., $200-$600). 2. Provide required documentation including a signed neighbor notification affidavit and proof of septic tank pumping within the last 3 years. 3. Renew the permit annually (renewal windows vary, e.g., Oct 1 - Feb 28 in Suttons Bay).
How do I get a short-term rental permit in Leelanau County?
1. Submit a completed Short-Term Rental Permit Application to the respective Township Zoning Office with the required fee (e.g., $200-$600). 2. Provide required documentation including a signed neighbor notification affidavit and proof of septic tank pumping within the last 3 years. 3. Renew the permit annually (renewal windows vary, e.g., Oct 1 - Feb 28 in Suttons Bay).

Disclaimer

This information is for general reference only and may not reflect the most current regulations. STR regulations change frequently. Always verify requirements with official local government sources before operating a short-term rental.

Last verified: March 2026 · Suggest a correction